Structured Wiring Is In

Can the garage be that far behind?

Week Ending May 2

This is a picture of Marty looking down from the attic.  About half of it will be finished.  Of course, it will not be over the master bedroom.  The cathedral ceiling gets in the way.  We were looking at the placement of lights and the ceiling fan.  it is amazing to see the web of wires and pipes forming inside the house.

The driveway was updated with some more crushed rock.  They put it inside the garage and covered the whole thing with a moisture barrier.  We thought that the garage would be poured the next day.  So far it hasn't happened.
This is the heart of the structured wiring.  It is in a closet downstairs.  We have all the electrical, cable TV and security system run through here.  For each bedroom there are two cable drops, four phone lines and two network connections.  They tell us the extra capacity is to accommodate future needs.  Nobody really knows what computers 10 years from now will need.
They are testing the Garden Tub.  What a name.  Right now, we look out into the woods behind our house.  (Curtains optional) We could have jetted the tub for extra money.  It didn't seem to justify the cost.  We are anxious just to sit in the tub and soak.